CONTACT US:400-609-2378
                current location :Home >> Product >> Heat Resistant Coating >> W61-09 High temperature resistant exhaust pipe coating
                W61-09 High temperature resistant exhaust pipe coating

                W61-09 High temperature resistant exhaust pipe coating

                Composition: It is composed of organic silicon resin, active antirust pigment, penetrating agent, curing agent, additives, etc.
                Performance: This product not only has high temperature resistant performance, but also has excellent weather resistant, corrosion resistant performance. After high temperature treatment, the paint film can make the organic silicon and silicate minerals connect together, so as to protect the base material. This product has improved the poor corrosion resistance ability of former organic silicone coatings under normal temperature, high temperature and washing alternate cooling and heating state.
                Application: The coating can be used in automobile, motorcycle, agricultural vehicle exhaust pipe, engine and diesel engine high-temperature parts.

                Product specification

                Temperature resistant range Paint film color Coating types Mixing  proportion
                500℃ Black, aluminum pink, metallic pigments Finish paint, primer, One-component, Dual-component
                600℃ Black, aluminum pink, metallic pigments Finish paint, primer, One-component, Dual-component
                700℃ Black, aluminum pink, metallic pigments Finish paint, primer, One-component, Dual-component
                800℃ Black, aluminum pink, metallic pigments Finish paint, primer, One-component, Dual-component

                Technical parameters

                Item Index
                One-component Dual-component
                Luster 1-10 1-5
                Viscosity(painting -4) 20~40s 20~40s
                Drying time Baking:220℃ 30min or 280℃ 10min surface dry ≤3h, hard dry ≤24h
                Flexibility ≤2mm ≤2mm
                Adhesion ≤2級 ≤2級
                Impact strength ≥40kg·cm /
                Heat resistance(500-800℃ 2h) Non foaming non cracking Non foaming non cracking
                Salt spray resistance (neutral) (210℃~220℃,Baking)200h 200h

                Construction method

                1、Base material processing The coated base material surface must carry out thorough removal of grease, scale, rust, old coating, and etc., using shot or sand blasting method, to reach Sweden derusting standard Sa2.5 grade and roughness of 30-70μm, manual derusting methods can also be adopted to reach Sweden derusting standard St3 grade and roughness of 30-70μm.
                2、Mixture (applicable for two-component paint)
                According to the weight ratio (the label on the product packaging shall prevail).
                When mixing, under the condition of stirring the main agent continuously, slowly pour in curing agent to make it fully ad evenly stirred.
                20 min after curing of the well mixed coating, filter with 60-80mesh screen, and pour into another container for spare use.
                The mixed coating is valid for 3 hours; please arrange the use according to the construction progress.
                3、Baking (applicable for one-component paint)

                Product name Baking temperature Holding time
                High temperature resistant exhaust pipe coating 220℃ 30min
                280℃ 20min

                4、Construction conditions
                Coating operation shall be performed as soon as possible after the substrate processing, generally not exceeding 8 hours. The substrate surface temperature and environmental temperature are generally no less than 10℃, the surface temperature shall be at least 3℃ higher than the dew point temperature, and the relative humidity of the air shall not exceed 85%.
                5、Coating method
                This coating can use brush coating, airless spraying and auxiliary air spraying method for construction.
                6、Dilution
                Generally the coating shall use the matching thinner to adjust viscosity and cleaning tools.
                7、Coating intervals
                One-component paint can carry out later coating after drying; two-component paint is suggested to have the coating time intervals as follows:

                Substrate temperature 5℃ 20℃ 30℃
                Shortest 48h 24h 12h
                Longest No limit
                欧美黑人肉体狂欢大派对-在线成本l人视频动漫|图片专区亚洲另类图片|自拍偷在线观看视频|影音先锋在播放资源站